logo
Sunday, July 12, 2020
Register

Contact Hotline: 01551 333 666

Bridge/Culvert Tender Notices

You will find all tender notices intended to procure Bridge/Culvert. At present we have 118 tender notices under this sub-category. Please let us know if you know about a particular tender notice but you did not find that tender notice here.

Construction of RCC & PC Girder Bridge. Construction of PSC Girder Bridge. Construction of PSC & RCC Girder Bridge. Construction of RCC Girder Bridge. Minor maintenance of RCC Box Culvert, RCC Girder Bridge. Construction of RCC Girder Bridge. Rehabilitation of Iron Deck Slab Bridge. Rehabilitation of Iron Deck Slab Bridge. Construction of Rest work of 250.20m long Bridge. Construction of PSC Girder Bridge. Construction of Long RCC Girder Bridge. Construction of PC Girder Bridge. Earthwork, widening, strengthening, New flexible pavement, surfacing, Construction of RCC Box culvert, Drain, Protective work, Sign, signal KM post and road marking work at Highway. Construction of Different RCC Girder Bridge. Construction of Different RCC Girder Bridge. Construction of 60m Long RCC Girder Bridge. Minor maintenance of RCC Box-Culvert. Minor maintenance of RCC Box-Culvert. Construction of Long RCC Slab Bridge. Construction of Long PSC Girder Bridge. Construction of Long PC Girder Bridge. Re-Construction & Construction/Extension of Flexible Pavement, R.C.C Box Culvert, and Earth work with Protective work of Road. Re-Construction & New Construction of Flexible Pavement, R.C.C Box Culvert, and Earth work with Protective work of Road. Construction of PC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Earth Work, Widening, Strengthening, Surfacing, Construction of RCC Girder Bridge, Drain, Protective work, Sign Signal, Km post & Road Marking work at Road. Re-Construction of bridge with temporary arrangement. Re-Construction of bridge with temporary arrangement. Construction of RCC Bridge & Culvert. Improvement of BFS work Road, Construction of Guide wall, Culvert. Improvement of BFS work Road, Construction of Ghatla, Culvert. Construction of Community Latrine, RCC Ghatla, Wall Palisading, Culvert. Improvement of Road by earth filling & Construction of Culvert, Wall Palisading, Boundary wall. Making of temporary arrangement for new construction Bridge no. 17/J in between station RHT-KRM at km. 455/0-2 including supply of bearing plate, carrying 3 nos. Girder from Birol station to bridge site with other related ancillary work. Construction of R.C.C Rood with Gide wall and Box-Culvert, Construction of RCC Box Culvert. Strengthening & Riveting of Steel Girders of Bridge including Riveting and Repairing With other ancillary works. Minor Maintenance of RCC Girder Bridge & Major Maintenance of Culvert.. Construction of Bridge, Road. Construction of Bridge, Road. Construction of Long Bridge including Approach. Construction of Bridge at River including 10 Nos RCC Box Culvert, RCC Toe Wall, RCC U-Drain, Brick Toe Wall, Brick Masonry Drain, Protective work by CC Block and Approach Road. Construction of Wooden Bridge at LGED Road. Re-Construction of RCC Box Culvert. Minor maintenance of PC Girder Bridge, RCC Box Culvert, RCC Slab Culvert. Construction of Bridge. Construction of Bridge. Rehabilitation of 1 no. single vent 2.0m x2.0m RCC Box Culvert. Construction of Brick Culvert. Repairing & riveting including Strengthening of girder following appropriate methodology and drawing set forth in bridge manual/way & works manual/ demonstration by the recognized designer approved by the competent authority of BR. at bridge no.26, 32, 44, 47, 56, 59, 69, 73, 90 & 91=Total-10 Nos with other allied works. Complete Re-building of BGML standard ( 25 Ton axle load) RCC box culvert, girder bridge including temporary arrangement and construction of ballast protection wall on both side with other allied works as per drawing. Re-Construction of bridge no-66 (B) (1x2m) RCC box culvert. Re-Construction of bridge. Partial Rebuilding of Bridge (span steel girder) DN line with Temporary Arrangement, along with repair to floor and construction of ballast wall at FNI-SRS Station with other allied works. Reconstruction of bed block in CTG end abutment, pier no. 1 & 2 including repairs to abutment wall, wing wall, retrun wall, droop wall, pointing, clearing water way with temporary arrangement of bridge. Construction of P.C Girder Bridge and RCC Culvert with Wing Wall. Construction of 25.00m Long PSC Girder Bridge. Construction of RCC Box Culvert. Rehabilitation of 3 nos 1.00x1.00m RCC Box Culvert. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of Culvert, Improvement of Road. Brick soling of road, Construction of Drain and Culvert. Improvement of Road, Providing Palasiding Work, Construction of RCC Box Culvert, Drain. Construction of Box Culvert. Construction of Box Culvert.. Improvement of Road, Construction of Culvert. Construction of Irrigation Drain, Brick Box- Culvert, Protection wall, Public Toilet, Estimate for Guide wall, Boundary wall, Supplying of Furniture, Estimate for Improved. of Madrasha. Improvement of Road and Construction of U-Drain, culvert. Construction of Class room, RCC culvert, Repairing of Road By WBM. Periodic Maintenance (Widening & Rehabilitation) of Road, Re-Construction of 18.00 m RCC Culvert. Construction of Bridge Fire Service and Civil Defense Station in/c. Main Building, Kitchen Building, External Water Supply, External Electrical, Site Development, Boundary Wall, Drain, Flag Stand, Fuel Shed, Internal Road and Pump House. Minor Maintenance of RCC Slab Culvert, RCC Girder Bridge, RCC Box Culvert. Construction of U-Drain, RCC box Culvert. Construction of Long RCC & Arch Girder Bridge including RCC Viaduct (Both side) . Construction of RCC surface drain & culvert. Construction of 57.698m Long P.C. & R.C.C. Girder Bridge. Construction of 28.780m Long P.C. Girder Bridge. Development of Jame Mosque, Construction of guide Wall and Bridge, Ghatla, Complete the incomplete works of Sculpture and Improvement of Yard. Pre-Qualification for the Selection of Contractor for Construction of Bridge. Construction of Long RCC Girder Bridge. Construction of Slab, Arch, Slab Bridge, Protective Work, Approach Road. Construction of Slab, Arch, Slab Bridge, Protective Work, Approach Road. Construction of Slab, Arch, Slab Bridge, Protective Work, Approach Road. Construction of PSC Girder Bridge. Rehabilitation of Road by BC, Construction of Culvert. Construction of RCC Road, Box Culvert. Construction of culvert. Construction of culvert with approach road. Construction of khulshi rail gate bridge. Construction of 90.00m Long PSC Girder Bridge. Construction of 25.00m Long PC Girder Bridge. Construction of RCC Bridge. Widening of Pavement, Strengthening, DBS Base & DBS wearing course, RCC box Culvert, U-drain, Rigid Pavement, Saucer Drain, Intersection, Bus-bay & Toe wall Chainage of Road. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Minor maintenance of RCC Box Culvert. Widening of Pavement, Strengthening, DBS Base & DBS wearing course, RCC box culvert, Sousar-drain, Bus-Bay & Toe wall chainage of Road. Construction of 30.00m Long PSC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Construction of PSC Girder Bridge. Major maintenance of 8.10m RCC Girder Bridge. Construction of Girder Bridge. Construction of Girder Bridge. Construction of RCC Girder Bridge. Construction of RCC Girder Bridge. Improvement of Road & Construction of Culvert, Girder Bridge & Drain. Improvement of Road, Widening of Box Culvert, Construction of PC Girder Bridge, Box Culvert. Improvement of Existing/New Two lane Highway int four Lane Highway with Median in/c all Structures, Earthwork, Foundation and Construction of Separate Lane, Bridge, Culverts, Railway Overpass, Underpass, Foot Over Bridge and Maintenance of newly Upgraded 4-lane Highway.
Free Registration
SiteLock